![]() |
NORTHOLT MODEL RAILWAY CLUBOO GAUGE SECTION |
|
Page Menu - just click a link ! |
The new layout is nearing completion after 10 years work, incorporating both continuous and station to station running. It features "fine scale" track with handbuilt pointwork which still allows running of most proprietary models. Now only the lower station MPD tracks require a little more work with a covering of ash and grime.
Seven control panels have been installed at various positions to drive the trains around the whole layout. Two of these have track circuit LED’s to show how the turnouts are set. The layout requires seven members to run track night schedules which take about one and half hours to complete.
The track nights occur about once a month and are themed, so that we cover all steam and diesel regions and time periods. Other nights are used as maintenance and work nights.
Below are some photographs of the layout on a running evening in April 2008.
For more detailed pictures of this layout click here |
| This page last modified
13 October 2011
All material on this website © Northolt Model Railway Club 2006 |