Site Diary (Page 2)
Home Up

 

Date '02 Thumb Nail Click on any picture for a larger view.  The images might take a little while to load, as they are large!
20 July view27.jpg (90578 bytes) Rain-drains ready for the next down poor!

"

view28.jpg (128740 bytes) Block wall complete, just waiting for concrete in-fill.
04 Aug view29.jpg (76435 bytes) Block wall filled with concrete and brick facing wall started.

"

view30.jpg (125711 bytes) Rain-drains attached to Drains.  Gravel placed next to shed base to aid further water drainage.

"

view31.jpg (33498 bytes) Yet more deliveries!  Everything on the back of that lorry was for me.  Plus, there was another smaller lorry waiting to unload after this one! (Some of these bits are not for the shed but a new pathway, as the existing pathway was destroyed by the heavy machines.)

"

view32.jpg (26832 bytes) Close-up of the wall showing bulk rejects place behind block wall (again) to aid drainage.
3 Tons of rejects were used behind the wall.
12 Aug view33.jpg (26171 bytes) Shuttering for concrete caps, to finish top of walls.
+ Rain stops play again!!
16 Aug

view34.jpg (68596 bytes)

The wood delivery.  The HIAB on this delivery lorry was very impressive.  It could reach the concrete base from the front of the garage!  Mind you, I could have done with this type of HIAB on all the deliveries earlier on in the project! 
10 Sep view48.jpg (93050 bytes) Picture shows finished capping on walls, blue slate and brick planter at the top of the picture.
 

Thats all for the site diary, hope you enjoyed viewing them...