20 July
Rain-drains ready for the next down poor!
"
Block wall complete, just waiting for concrete in-fill.
04 Aug
Block wall filled with concrete and brick facing wall started.
"
Rain-drains attached to Drains. Gravel placed next to shed base
to aid further water drainage.
"
Yet more deliveries! Everything on the back of that lorry was for
me. Plus, there was another smaller lorry waiting to unload after
this one! (Some of these bits are not for the shed but a new pathway, as
the existing pathway was destroyed by the heavy machines.)
"
Close-up of the wall showing bulk rejects place behind block wall
(again) to aid drainage.
3 Tons of rejects were used behind the wall.
12 Aug
Shuttering for concrete caps, to finish top of walls.
+ Rain stops play again!!
16 Aug
The wood delivery. The HIAB on this delivery lorry was very
impressive. It could reach the concrete base from the front of the
garage! Mind you, I could have done with this type of HIAB on all
the deliveries earlier on in the project!
10 Sep
Picture shows finished capping on walls, blue slate and brick planter at
the top of the picture.