Shed Diary
Back Home Up Next

 

Date '02 Thumb Nail Click on any picture for a larger view.  The images might take a little while to load, as they are large!
22 Aug view35.jpg (113358 bytes) Wow, now that was quick, 2 hours, a nail gun and a plan....!
24 Aug view36.jpg (80155 bytes) 3 sides and not bolted together yet.  Ensuring everything is square.  Clamps are a great invention.

"

view37.jpg (86308 bytes) A different view.

"

view38.jpg (40264 bytes) Slightly angled...!  Yes, they are square.
28 Aug view39.jpg (47833 bytes) Now with a door frame.
29 Aug view40.jpg (44425 bytes) Half of the roof joists.

"

view41.jpg (152761 bytes) A different and closer view.
30 Aug view42.jpg (37850 bytes) Roof Board going on + covered up to stop any rain!  (+Plenty of weight to stop covers blowing away.)

"

view43.jpg (56890 bytes) Inside view of the roof.
31 Aug view44.jpg (18874 bytes) Those paw prints....!!!

"

view45.jpg (52009 bytes) Facia boards are now in place.
10 Sep view46.jpg (100620 bytes) First wall to be cladded.

"

view47.jpg (47553 bytes) Two sheets of PRB insulation cut to size and placed in between beams.
(PRB insulation = high density foam with silver foil laminated on the top and bottom surfaces.)

"

view49.jpg (116918 bytes) Two walls insulated....yep...missed a bit...!

"

view50.jpg (139821 bytes) Finished side with facia board ready for guttering.....as I am sure it won't be long before we will be needing those gutters!
16 Sep view51.jpg (26324 bytes) Builders paper on, and first length of cladding attached.

"

view52.jpg (29548 bytes) The Nail Gun - you don't want to be on the wrong side of this baby when she fires!
Very impressive bit of kit + saves loads of time.

"

view53.jpg (111511 bytes) Front of shed fully cladded.

"

view54.jpg (64838 bytes)

View showing corner and how the edges of the shiplap are hidden.

"

view55.jpg (51060 bytes)

View as the sun sets.....another weekend's work finished....+ it did not rain.  Shed waiting for a roof next.
22 Sept

view56.jpg (73562 bytes)

That hot tar roof....real weather proofing at last....

"

view57.jpg (31579 bytes)

Hum....sticky....

"

view58.jpg (71155 bytes) Insulation finished - at last.  Plywood walls going up.
29 Sept view59.jpg (45491 bytes) Finished roof, ready for all that rain.

"

view60.jpg (39887 bytes)

That hand made door....waiting to be hung.
22 Oct view61.jpg (141957 bytes) The Finished shed (outside).
Must try and take a photo when it is daylight....
24 Nov view62.jpg (55243 bytes) Underlay, Fibre board and then another layer of underlay going down, then carpet tiles on top.  I don't want me feet to chill on that concrete floor.
" view63.jpg (17171 bytes) Floor completed.  As you can see, the walls have been painted, and electrics installed.
 

Use the links at the top of the page to view the other diary photos!